Start-up of PCS for Line Heaters PPT-3

Insist Avtomatika completed start-up of automation systems for two line heaters PPT-3 installed in the shop of the 1st process line at the oil and gas treatment plant of the East section of Orenburg oil, gas and condensate field (Gazpromneft-Orenburg).

The oil heating process control systems were built on serial equipment of line heaters automation system ISA-PP-DSKM developed by Insist Avtomatika. The automation system ISA-PP-DSKM is widely used in oil and gas production and is characterized by high reliability and ease of operation. The system is highly appraised by the operating personnel.