Process Control System of a Gas Condensate Field
Schneider Electric (SCADAPack)
Oil resources: 9 million tons
Gas well pads – 43
Number of wells per one well pad – 3-4
Gas main pipeline – 118 km
Gas gathering lines – 29.1 km
Complex gas treatment facility – 10 billion cubic meters
The most important task of this project is system integration, consolidation of heterogeneous systems from different vendors into a single system.
Insist Avtomatika performed works on design, construction, delivery, and commissioning of process control systems for gas production, monitoring of energy complex, network infrastructure, data and information systems of gas production and transportation facilities on a turnkey basis.
An integrated system of automated reporting was implemented as part of information and control levels of the control system. Functional modules of operational technical reports of complex gas treatment facility, wells monitoring, pumping equipment operating time and material accounting module were also implemented.
Gas gathering line, gas pipelines
Complex gas treatment facilities
Compressor stations
Gas measuring stations
Crude storages
Water intake facilities
Fire-control units
Gas powered electrical generators
Power supply facilities